Airline passengers get on board with energy chain solutions

  • What was needed: E4/4 chains, E2-zig-zag chain, chainflex® TPE special cables, 400 Hz special cable
  • Requirements: high safety precautions delay installation, installation must be flexible to suit the volume of travellers
  • Industry: Airport
  • Success for the customer: completely revised energy chain system with better access, flexible and punctual installation
Passenger aircraft on the airport apron under a jet bridge.

Problem

Solution

Boarding bridge with stairs on the apron.
Cable chain at a machine opening under a metal cover.

Installation service with maximum flexibility

Aircraft at an airport with two workers on a lift platform.

Consulting

I look forward to answering your questions

Hennlich OOD | Хенлих ООД+359 32 621929Write e-mail

Shipping and consultation